Biomethane: An Immediate Clean Power Solution for Data Centre Energy Needs

Cultivating an attractive investment landscape for data centres requires competitively priced, dispatchable and low-carbon energy supplies that utilise existing infrastructure – bypassing the multi-year grid connection queue.

Behind-the meter biomethane is increasingly recognised by data centre developers as an immediate, clean power solution; evidenced by 86 formal enquiries submitted by developers to gas distribution networks between August 2024 and July 2025.

Integrated alongside other renewable technologies, biomethane serves as a vital clean power enabler, ensuring rising data centre demand is met with reliable, low-carbon power.

Find the full document here: Biomethane: An Immediate Clean Power Solution for Data Centre Energy Needs