Search results for tag:
-
Soaring gas prices demonstrates need for diverse decarbonised energy system
-
REA Members Brief: Planning for New Energy Infrastructure Draft National Policy Statements for Energy Infrastructure
REA Members Brief:
Planning for New Energy Infrastructure Draft National Policy Statements for Energy Infrastructure
-
Member’s Briefing – BEIS Publishes Details of the CfD Allocation Round 4
The department of Business, Energy and Industrial Strategy (BEIS) has published further details of the Contracts for Difference (CfD) Allocation Round 4.
-
BEIS launches a new consultation on the New Energy Infrastructure consultation
-
REA draft response to Future System Operator Consultation
After feedback from REA members we have completed our first draft Response to Future System Operator Consultation.
-
REA draft response to the Facilitating the deployment of large-scale and long-duration electricity storage: call for evidence
After feedback from REA members we have completed our first draft response to the Facilitating the deployment of large-scale and long-duration electricity storage: call for evidence.
-
Smart Systems & Flexibility Plan Member’s Brief
The Government has published its updated Smart Systems & Flexibility Plan (SSFP). Here’s a comprehensive list of commitments
-
Key general points from The Transport Decarbonisation Plan
Here are some points from the Transport Decarbonisation Plan that the REA considers particularly notable for our members.
-
European Commission Releases Fit for 55 Decarbonisation Plan
The key documents of the Fit for 55 plan, including a brief summary of their contents
-
REA welcomes new UK Infrastructure Bank and regional investment, but says Budget misses opportunity for a ‘green’ recovery
-
REA EV, Storage, and Power Generation – Draft Wayleaves Paper
REA Wayleaves Reform Draft Paper for Member Review
-
‘Green Homes Grant needs improvements to be successful’
-
REA and industry call for domestic energy storage VAT cut
-
REA consultation response to GC0147: last resort disconnection of embedded generation
The REA has published their consultation response to GC0147, accessible to REA members. The consultation was on disconnecting embedded generation as a last resort.
-
REA notes from BEIS workshop on Carbon in Flexibility Markets
The REA has written notes after attending a BEIS workshop on Carbon in Flexibility Markets.
-
New definition for energy storage must be a ‘stopgap measure’ only
REA comment: New definition for energy storage must be a ‘stopgap measure’ only
-
Planning changes for electricity storage to boost subsidy-free renewables
REA comment on changes to planning framework for energy storage
-
REA Power Member Briefing – BSUoS Cost Spreading – CMP345
A briefing for REA members involved in electricity generation (transmission & distribution connected), energy storage, finance, and energy supply on CMP345 proposing to defer increased BSUoS costs incurred this summer due to COVID-19.
-
REA member briefing on Capacity Market changes
Briefing for members on major changes, including introduction of an emissions threshold.
-
Capacity Market changes to help open up market for energy storage
REA comments on Government change to the Capacity Market and introduction of an emissions threshold.