Search results for tag:
-
CMP448 – Introducing a Progression Commitment Fee to the Gate 2 Connections Queue Brief
-
REA Member Briefing: CMP393 Grid Code Modification Rejected
REA Member briefing on the rejection of CMP393 – important to storage operators
-
Track List of Grid Modification Updates
The REA’s track list of all the grid and connection code modifications proposed to the Electricity System Operator (ESO).
-
REA Response to ENA G100 Grid Code Modification Consultation – “Technical Requirements for Customers Export and Import Limitation Schemes”
REA Response to G100 Consultation
